The design is signed off. Now it has to go live.
The launch date is getting closer. We build it in Webflow, or Framer when that fits better, exactly as designed. Your team gets a CMS it can run without filing a ticket. Whoever designed it, we build from the file. We're a Webflow Certified Partner, in case your procurement team asks.
From Figma file to live site in about three weeks
We read the design before we quote it, then build on a staging site you can click through from the first week. Launch happens when QA is done, not when the calendar says so.
Design review and setup (week 1)
We go through the Figma file page by page and flag anything that won't build the way it looks. Then we set up the Webflow project: staging site, CMS structure, class system and global styles. If something in the design needs to change, you hear it now, not in week three.
Build (weeks 1-2)
Every page built to the design at every breakpoint, with interactions, forms and the CMS wired up. You can click through the staging site as it grows.
QA and accessibility (week 3)
Cross-browser and device testing, performance checks, keyboard navigation, focus states and alt text, with every old URL redirected to its new home. The unglamorous week that makes the first two look good.
Launch and handoff (week 3)
We launch it, then run a hands-on session so your team can edit, publish and add pages without us. Thirty days of support follow, because something small always turns up on day four.
Two ways to start. Both scoped after a call.
Landing page build
Your landing page design, built and live in Webflow. Responsive and fast, with forms and tracking connected, ready for the launch or campaign it was designed for. Designed by us or by someone else, we build from the Figma file.
- A review of your Figma file before we start, so problems surface on day one
- A fully responsive build in Webflow (or Framer, if you prefer)
- Interactions and hover states as designed
- Forms connected to your inbox or CRM
- Basic SEO setup: meta tags, sitemap, social images
- Analytics and tracking tags installed
- A staging link from the first week
- Direct Slack access to our team
- One round of revisions
Complete website build
The whole site, built in Webflow from your design: a homepage plus up to five pages, a CMS your team controls and the training to use it. Built so the next page, post or case study is something you publish on a Tuesday, not something you brief.
- A design review in week one, so anything that won't build as drawn comes up early
- A homepage plus up to five pages, responsive at every breakpoint
- A CMS set up for what you'll actually publish: blog, case studies, team, resources
- A component-based build, so new pages assemble from existing parts
- Interactions and scroll animation as designed
- Accessibility built in (WCAG 2.1 AA): semantic structure, keyboard navigation, focus states
- SEO setup, with every old URL redirected to its new home
- Forms, analytics and the integrations you need connected
- A hands-on training session, so your team can build new pages from day one
- A staging site from week one
- Direct Slack access to our team
- 30 days of support after launch
From fintech teams launching in regulated markets to AI platforms raising their Series A. We show up when timing matters.
What people ask before they hire us
Is your question not listed here?
Please get in touch at hello@bhong.com
Why build in Webflow instead of WordPress or custom code?
For a marketing site, Webflow ships faster, loads fast out of the box and lets your team edit without plugins, security patches or a developer on call. It's also the wrong tool sometimes. If the site is really a web app with logins and logic, you need engineers, and we'll say so before you spend anything.
Can you build from a design someone else made?
Yes. Send the Figma file and we'll review it before quoting. If something won't build the way it's drawn, you hear it up front, along with what we'd change.
Can I update the site myself without a developer?
Yes, that's the point. The CMS is set up around what you'll actually publish, and the training session covers editing, publishing and building new pages from existing components. Nobody should have to learn it from a help article at 11pm.
What happens to our SEO when we relaunch?
We map every old URL to a new one before launch and carry over your titles and descriptions. Rankings can wobble for a few weeks after any relaunch, but they shouldn't fall off a cliff.
How is a build priced?
We review your design first, then quote a fixed price. A landing page takes one to two weeks, a full site two to three. Design isn't included, but our website design service pairs with this one.
How long does a Webflow build take?
A landing page takes one to two weeks. A complete site takes two to three, assuming the design is signed off. Content arriving late is the most common reason a launch date slips, so send it early.
Do you build accessible, WCAG-compliant sites?
Yes, to WCAG 2.1 AA: semantic structure, keyboard navigation, visible focus states, alt text, and contrast checked against the design. For fintech and other regulated products that's often a requirement, so we don't treat it as optional.
What support do you offer after launch?
Every full build includes 30 days of support for bugs and small tweaks. After that, we can stay on for ongoing design and development. We'll scope it around what you actually ship.


